|
|
||
Go to the previous, next section.
Creation of the Group
If, after the waiting period, there are no serious objections that
might invalidate the vote, the vote is put to the "water test." If
there were 100 more valid `YES/create' votes than `NO/don't'
create votes, and at least two-thirds of the total number of votes are
in favor of creation, then a newgroup control message can be sent out
(often by the moderator of
If the proposal failed, all is not lost--after a six-month waiting
period (a "cooling down"), a new Request For Discussion can be posted
to
Go to the previous, next section.
|
|||
Copyright © 1998, Software Engineering LaboratoryNational Technical University of Athens |